For Tier 1 Consultants

Specialist trenchless input-without skin in the bid.

You're leading the design. Trenchless is one of several methods on the table. You don't have a deep specialist on the team - and bringing a contractor in this early creates conflicts you'd rather avoid.

You need someone who knows what tunnelling, microtunnelling, pipejacking, HDD, guided boring, pipe rehabilitation, and shaft construction can actually deliver in the ground we have - and isn't trying to win the build.

That's what HarkerWize is for.

01

Concept-stage optioneering

Trenchless option shortlist, ranked by risk and cost-defensibility.

02

GBR red-flagging

Risk-by-chainage review. The ground conditions a contractor will challenge — flagged before they do.

03

Constructability review

Independent review at G1, G2, G3. Findings documented for the gate pack.

04

Tender QA

Bid means and methods, programme assumptions, contract clause review.

05

P50–P90 pressure-test

Cost and schedule confidence numbers reviewed against industry benchmarks.

06

Expert witness / dispute

Independent technical opinion when a method-driven claim needs to be defended.

Six Ways We Support Your Design

Engagement

Lump-sum or daily rate. Scoped to the gate or milestone. NDA standard. We work inside your team.

Deliverables

Memos, registers, GBR mark-ups, review reports. Written so your design team can use them directly.

Independence

We don't tender for the build. We don't have a parent contractor. What you see is what you get.

How It Works

Send us your alignment, your geotech, and the gate you're heading into. We'll tell you in plain language what we can add.